NRG 158 - Thermal Design and Installation 1 |
Prerequisite: PH 101 and PH 102 and MTH 095 or Math Placement Test or Department Approval. This hands-on course covers the Oregon Plumbing code as it relates to solar Domestic Hot Water (DHW) system installation. System type, tanks, controls, pumps, valves, mounting systems and installation safety will be discussed and demonstrated. Students will use materials designed for installation practice both indoors and out.
4.000 Credit hours 22.000 TO 24.000 Lecture hours 44.000 TO 48.000 Other hours Levels: Credit Schedule Types: Lecture plus Lec/Lab Inst for Sustainable Practices Division Inst for Sustainable Practices Department Course Attributes: Tuition, Career and Technical Education |